OrinovateOrinovate

Quality Assurance

Every Part Has to Survive the Real World

From incoming material verification to final pre-shipment measurement, Orinovate runs a single quality system across design, manufacturing, inspection, and supplier management — so every 3D-printed and CNC part lands within drawing tolerance, batch after batch.

Every Part Has to Survive the Real World

99.2%

First-Pass FAI Rate

Production parts passing first-article inspection in the last 12 months

≤ ±0.025 mm

CMM Accuracy

Calibrated accuracy of our coordinate measuring machines

100%

Full Traceability

Material, process parameters, and inspection records kept per part

ISO / AS

Dual QMS

ISO 9001 and AS9100D running in parallel

Quality Is Designed and Built In, Not Inspected In

Quality Is Designed and Built In, Not Inspected In

We do not treat quality as a last stop where defective parts get pulled. Orinovate's quality system kicks in the moment a STEP file lands: DFM engineers check whether the geometry and tolerances are realistic, process engineers pick equipment and parameters that can hold the spec stably, and inspection covers four independent checkpoints — incoming, first article, in-process, and final.

The point is not a pretty statistic. It is predictability. The part you receive in batch one and the part you receive in batch thirty should be indistinguishable in tolerance, surface, and appearance. That is what production buyers in medical, aerospace, and automotive actually pay for.

Inspection & Metrology

We invest in equipment and people that get the measurement right the first time

Coordinate Measuring Machines (CMM)

Zeiss and Mitutoyo CMMs calibrated to ±0.0025 mm, used for critical features, complex tolerances, and true-position verification. Programs are saved and reused for follow-on batches.

Optical & Profile Measurement

Vision systems and optical comparators handle thin-walled, deformable, or non-contact-friendly parts, and run fast in-line sampling during production.

Surface & Form Tolerance

Mitutoyo roughness testers and roundness gauges measure Ra/Rz and form tolerances (roundness, flatness, perpendicularity) per ISO 1302 and GD&T callouts.

Material & Hardness Verification

Rockwell and Vickers hardness testing plus XRF composition checks. All metal-printed and CNC parts ship with material COC; metal powders are batch-tested for particle size and chemistry.

Five Quality Gates Between STEP File and Shipment

Five Quality Gates Between STEP File and Shipment
01

DFM & Drawing Review

Engineers review geometry, tolerance feasibility, and manufacturing risk before the job opens.

02

Incoming Material & Powder

Metal powders and engineering plastics are tested for chemistry, particle size, and flowability on arrival; COC is filed against the lot number.

03

First Article Inspection

The first part of every new order is fully measured on CMM with an FAI report. Production only ramps after the process is proven stable.

04

In-Process Control

SPC sampling records key dimensions and machine parameters. Any batch breaching control limits stops the line for analysis.

05

Final Pre-Shipment Inspection

Dimensions, surface, cosmetics, and packaging are inspected per part or per AQL plan. Inspection reports and a Certificate of Conformance ship with the parts.

Certifications & Systems

We run multiple quality systems in parallel to meet different industries' regulations and customer requirements

ISO 9001:2015

General quality management system. Every job runs under this baseline.

AS9100D

Aerospace QMS covering risk management, configuration control, and special-process qualification.

Quality Documentation We Provide

Tell us which package you need; production programs default to the full set.

DocumentScope
First Article Inspection (FAI)New part numbers, new tooling, post-process-change first-offs
Dimensional Inspection Report (DIR)Measured value per drawing callout
Certificate of Conformance (COC)Per-lot raw-material COA plus internal verification
SPC Control ChartsX-bar / R charts of key dimensions for production batches

Send Us Your Drawing — See What the Quality System Does for You

Upload a STEP or STL file. We respond with DFM feedback and a quote within 48 hours; production programs ship with a full quality plan.